Every cabinetry project is custom designed, with costs influenced by layout, materials, finishes, hardware and detailing. Until designs and selections are finalised, it’s difficult to provide an accurate price. Detailed quoting ensures transparency and avoids unexpected variations later.
Design and drafting typically takes several weeks, depending on the complexity of the project and the number of revisions required. This stage is essential to ensure accuracy, functionality and a smooth transition into production.
Revisions are a normal part of the process, however each round of changes requires drawings to be reviewed and updated. Multiple revisions can extend the overall timeline, particularly prior to final approval.
A project is confirmed once final designs are approved and the deposit has been received.
Production lead times vary based on material availability, finishes, hardware selections and overall project scope. Custom finishes or specialty products may require longer lead times.
Yes. We regularly work alongside your builders and trades to ensure cabinetry is installed at the appropriate stage of the build or renovation. Clear communication and site readiness are essential for a smooth installation.
Key cost drivers include the size and layout of cabinetry, material and finish selections, internal storage solutions, hardware upgrades and the level of custom detailing involved.
Once cabinetry enters production, changes are generally not possible. This is why careful review and approval of all drawings and selections is critical before signing off.
Yes. Samples are available in our showroom to assist with selecting finishes, colours and materials, ensuring confidence in your choices before final approval.